*Guarantee: 
Accurate locates on all known utilities with known hook up locations, properly installed tracer wires, and no breaks in continuity.  Utility locates where a location in which to connect is not accessible cannot be guaranteed.  Please make a note of this.

ASU West 2008
Work performed:  Locate buried valves, manhole covers; locate utilities under concrete slab in and around buildings.

Kimbrell Electric
ASU West Light Project 2008:  Locate all private and buried utilities along a ¼ mile path.  Utilities discovered whose location were not known where, sewer, landscape electrical, fire line water, water mains, main power supply and natural gas.

Peoria Schools Light and score board Project 2008:
Locate all private and public electric and water around baseball fields and concession stands.

Sun City Fairways 2008:
Locate and trace all utility supply lines.  This two phase project required contractors to demolition and rebuild the entire complex in two phases.  This required discovery of all the utility feeds so service could be maintained while demolition took place on half of the complex.  Then once the first phase of the project was completed the second half of the project was to be demolished.

Sunrise RV 2008:
Locate all utilities in club house, pool area, kitchen, and guard gates.  The electrical distribution and phone line distribution were discovered to traverse the proposed excavation.

Cell Tower Utility Locates 2007:
Locate Utilities and depth for construction additional services to cell tower.

Private Property Owners remodeling or adding a pool:
Locate sewers laterals and utilities for property owners.